Home / Project Profiles / Highland Lake Asheville, NC
Project Solution

Requirement for the HVAC equipment to be in a conditioned air-sealed environment; meet the building code requirement for Energy Efficiency and Safety for Spray Foam Insulation; and to cover the exposed Fiberglass.
New Attic Hybrid System for Cathedral Ceilings:
- 2” x 10” framed roof (unvented)
- 2” of 2lb or closed cell R-6.0 SPF
- 6.25” of R-19 Fiberglass unfaced batt
- Silver Shield multi-layer radiant barrier/reflective insulation
New Attic Hybrid System for Cathedral Ceilings:
- 2” x 10” framed roof (unvented)
- 2” of 2lb or closed cell R-6.0 SPF
- 6.25” of R-19 Fiberglass unfaced batt
- Silver Shield multi-layer radiant barrier/reflective insulation